Demandez votre devis sans obligation en suivant les instructions suivantes:
To calculate the time audit HFQ-7.2-F02 « Time Audit Calculation » Timing chart audit, which has been developed is used considering the specifications of the regulations of Annex B of GSO 2055-2: 2021,SMIIC 2:2019, 9.1.4. of ISO 17021-1: 2015 and other aspects indicated in paragraph 9.1.5 of GSO255-2 and 9.1 SMIIC 2.
The calculation of the minimum time audit is performed by the following formula:
Ts = TD + TH + TMS + TFTE
TD: minimum time (in days) in factory audit
TH: Minimum time (days) for each additional audit Additional study HACCP applied to products and services in the food chain.
TMS: Audit days in absence of management system
TFTE: minimum time (days) number of workers
*Les honoraires budgétaires sont calculés sur la base de la durée estimée de l’audit.